4. “NOR EXCEPT AS…PROVIDED HEREUNDER TO ORDER ANY WORK INVOLVING DELAY OR ANY EXTRA PAYMENT…TO MAKE ANY VARIATION OF OR IN THE WORKS”. See N. 11 on variations. These words emphasise what is said in the last note: the contractor is not entitled to found a claim for extra payment or to extension of time on an order of the representative, unless there has been delegation under sub-cl. (3).?

5. CONTROL OF TEMPORARY WORKS BY ENGINEER’S REPRESENTATIVE. As a result of the extended definition of “Works” in cl. 1 (1) (l), the representative’s supervision now extends to all temporary works (p. 29).

6. TESTING OF MATERIALS is no longer included in the representative’s ordinary duties, and apparently must be delegated under sub-cl. (3).

7. POWERS OF ASSISTANTS OF ENGINEER’S REPRESENTATIVE. The effect of this clause is that an assistant of the representative may issue instructions only if they are both within the functions allotted to him by the representative or engineer and notified to the contractor (which functions may be limited to a particular area or operation of the works) and are issued to ensure that work or materials are acceptable to the assistant as being in accordance with the “Specification and Drawings”. The contractor cannot recover payment for a variation on an assistant’s order under this sub-clause; therefore he should not do work which he considers to be an enhancement of the specification or change in drawings at the behest of an assistant, without complying with cl. 51 (2).

Where the materials or workmanship required are not defined in the specification or drawings, for example in the case of contractor’s own temporary works and items of permanent work of which the engineer’s control is solely under cl. 13 (2), it appears that an assistant can have no function. And there is no reference to the assistant ensuring that the works are in accordance with instructions of the engineer unless embodied in drawings or amounting to a specification (compare cl. 26 (2) (a) and (b)).

Clearly, one function may be allotted to a number of assistants without division between them.

8. DELEGATION “FROM TIME TO TIME”. That is, the engineer may delegate at any time during the contract, or at any time increase, change (for example during holidays or illness) or determine any delegation for the future. For written notification of delegation and changes see N. 13. The engineer has no power to alter these Conditions and therefore delegation binds the employer only if it is in writing as required by this sub-clause, unless he has given the engineer additional authority.

9. DELEGATION BY THE ENGINEER TO “THE ENGINEER’S REPRESENTATIVE OR ANY OTHER PERSON RESPONSIBLE TO THE ENGINEER”. The limitation that delegation may only be to a person “responsible to the Engineer” is long in good intentions—that any person exercising the very important powers and judgments which the engineer may delegate must be responsible to him—but short in precision. Some relevant points:

(a) An employee of the engineer obviously is responsible to him and may receive delegated powers under this sub-clause (but see p. 384, N. 26, for the engineer’s resulting responsibility for the delegate). An engineer who is a whole-time employee of a local or other public authority may presumably delegate functions to an assistant of his although they are fellow employees of the authority.

(b) Where a partnership is named as an engineer, it seems that powers may be delegated to any one partner as a person responsible to the majority of the partners. But where one partner is appointed engineer, he may not delegate power to another partner, since one partner is not “responsible to” another, in the sense of being bound to obey him.

(c) It is not unusual for the employer to employ direct a mechanical services consultant to deal with supply and installation of plant which is part of the construction contract. The engineer may wish to delegate some of his functions to such a consultant, but may not do so under this clause unless the consultant is employed by him (with attendant dangers, p. 384) and not direct by the employer, or some special arrangement is made ((f) below) by which the consultant is made responsible to the engineer.

(d) The engineer is specifically authorised to delegate powers to the engineer’s representative, even though the representative may be appointed by and paid by the employer. The representative may be a long-term employee of a local authority employer, with corresponding duties and loyalties (and pension expectations).

(e) Unless their position is clarified by a special arrangement, it does not seem that the engineer may delegate to assistants of the representative who are employed direct by the employer (by sub-cl. (2) such persons are to “assist the Engineer’s Representative” in the exercise of his functions “under sub-clause (1)”), but in any case they are unlikely to be of sufficiently high grade to justify delegation at least on major matters.

(f) It is implied that any person in the doubtful categories discussed above or any other person may be made responsible to the engineer without becoming his employee, presumably by a (preferably written) agreement to which he is a party with the engineer and his own employers providing that he will be responsible to the engineer in performing any delegated duties. There are problems as to how exactly such an agreement must be worded. Clearly, the delegate must be required to obey the instructions of the engineer and not to obey any instructions from his employer or anyone?else, and the engineer must have authority to end his delegated powers. Whether the employer may retain the power to dismiss the delegate from the works or from his employment generally is not clear. The fact that delegation is specifically allowed to the engineer’s representative even if employed by the employer suggests that sole responsibility to the engineer is not required. The question of liability for the delegate, his errors or dishonesty, should be dealt with carefully in the agreement. The engineer may notwithstanding any agreement be liable to outsiders for the delegate and should make certain that his indemnity insurance covers the arrangement. p

The contractor is protected to some extent against mistaken or improper decisions of delegates by the right of appeal to the engineer, as well as the right to arbitrate, unless the engineer is foolish enough to take the not uncommon attitude that he must support his colleagues and subordinates vis-à-vis the contractor even when they are wrong.

Delegates are clearly bound by the same duty of independence and impartiality as the engineer (ch. 14).

?著作權(quán)歸作者所有,轉(zhuǎn)載或內(nèi)容合作請(qǐng)聯(lián)系作者
  • 序言:七十年代末狗准,一起剝皮案震驚了整個(gè)濱河市,隨后出現(xiàn)的幾起案子勺届,更是在濱河造成了極大的恐慌驶俊,老刑警劉巖,帶你破解...
    沈念sama閱讀 219,490評(píng)論 6 508
  • 序言:濱河連續(xù)發(fā)生了三起死亡事件免姿,死亡現(xiàn)場(chǎng)離奇詭異饼酿,居然都是意外死亡,警方通過(guò)查閱死者的電腦和手機(jī),發(fā)現(xiàn)死者居然都...
    沈念sama閱讀 93,581評(píng)論 3 395
  • 文/潘曉璐 我一進(jìn)店門(mén)故俐,熙熙樓的掌柜王于貴愁眉苦臉地迎上來(lái)想鹰,“玉大人,你說(shuō)我怎么就攤上這事药版〖希” “怎么了?”我有些...
    開(kāi)封第一講書(shū)人閱讀 165,830評(píng)論 0 356
  • 文/不壞的土叔 我叫張陵槽片,是天一觀的道長(zhǎng)何缓。 經(jīng)常有香客問(wèn)我,道長(zhǎng)还栓,這世上最難降的妖魔是什么碌廓? 我笑而不...
    開(kāi)封第一講書(shū)人閱讀 58,957評(píng)論 1 295
  • 正文 為了忘掉前任,我火速辦了婚禮剩盒,結(jié)果婚禮上谷婆,老公的妹妹穿的比我還像新娘。我一直安慰自己辽聊,他們只是感情好纪挎,可當(dāng)我...
    茶點(diǎn)故事閱讀 67,974評(píng)論 6 393
  • 文/花漫 我一把揭開(kāi)白布。 她就那樣靜靜地躺著跟匆,像睡著了一般异袄。 火紅的嫁衣襯著肌膚如雪。 梳的紋絲不亂的頭發(fā)上贾铝,一...
    開(kāi)封第一講書(shū)人閱讀 51,754評(píng)論 1 307
  • 那天隙轻,我揣著相機(jī)與錄音,去河邊找鬼垢揩。 笑死玖绿,一個(gè)胖子當(dāng)著我的面吹牛,可吹牛的內(nèi)容都是我干的叁巨。 我是一名探鬼主播斑匪,決...
    沈念sama閱讀 40,464評(píng)論 3 420
  • 文/蒼蘭香墨 我猛地睜開(kāi)眼,長(zhǎng)吁一口氣:“原來(lái)是場(chǎng)噩夢(mèng)啊……” “哼锋勺!你這毒婦竟也來(lái)了蚀瘸?” 一聲冷哼從身側(cè)響起,我...
    開(kāi)封第一講書(shū)人閱讀 39,357評(píng)論 0 276
  • 序言:老撾萬(wàn)榮一對(duì)情侶失蹤庶橱,失蹤者是張志新(化名)和其女友劉穎贮勃,沒(méi)想到半個(gè)月后,有當(dāng)?shù)厝嗽跇?shù)林里發(fā)現(xiàn)了一具尸體苏章,經(jīng)...
    沈念sama閱讀 45,847評(píng)論 1 317
  • 正文 獨(dú)居荒郊野嶺守林人離奇死亡寂嘉,尸身上長(zhǎng)有42處帶血的膿包…… 初始之章·張勛 以下內(nèi)容為張勛視角 年9月15日...
    茶點(diǎn)故事閱讀 37,995評(píng)論 3 338
  • 正文 我和宋清朗相戀三年奏瞬,在試婚紗的時(shí)候發(fā)現(xiàn)自己被綠了。 大學(xué)時(shí)的朋友給我發(fā)了我未婚夫和他白月光在一起吃飯的照片泉孩。...
    茶點(diǎn)故事閱讀 40,137評(píng)論 1 351
  • 序言:一個(gè)原本活蹦亂跳的男人離奇死亡硼端,死狀恐怖,靈堂內(nèi)的尸體忽然破棺而出寓搬,到底是詐尸還是另有隱情珍昨,我是刑警寧澤,帶...
    沈念sama閱讀 35,819評(píng)論 5 346
  • 正文 年R本政府宣布句喷,位于F島的核電站镣典,受9級(jí)特大地震影響,放射性物質(zhì)發(fā)生泄漏脏嚷。R本人自食惡果不足惜骆撇,卻給世界環(huán)境...
    茶點(diǎn)故事閱讀 41,482評(píng)論 3 331
  • 文/蒙蒙 一瞒御、第九天 我趴在偏房一處隱蔽的房頂上張望父叙。 院中可真熱鬧,春花似錦肴裙、人聲如沸趾唱。這莊子的主人今日做“春日...
    開(kāi)封第一講書(shū)人閱讀 32,023評(píng)論 0 22
  • 文/蒼蘭香墨 我抬頭看了看天上的太陽(yáng)甜癞。三九已至,卻和暖如春宛乃,著一層夾襖步出監(jiān)牢的瞬間悠咱,已是汗流浹背。 一陣腳步聲響...
    開(kāi)封第一講書(shū)人閱讀 33,149評(píng)論 1 272
  • 我被黑心中介騙來(lái)泰國(guó)打工征炼, 沒(méi)想到剛下飛機(jī)就差點(diǎn)兒被人妖公主榨干…… 1. 我叫王不留析既,地道東北人。 一個(gè)月前我還...
    沈念sama閱讀 48,409評(píng)論 3 373
  • 正文 我出身青樓谆奥,卻偏偏與公主長(zhǎng)得像眼坏,于是被迫代替她去往敵國(guó)和親。 傳聞我的和親對(duì)象是個(gè)殘疾皇子酸些,可洞房花燭夜當(dāng)晚...
    茶點(diǎn)故事閱讀 45,086評(píng)論 2 355

推薦閱讀更多精彩內(nèi)容