Procurement Management is considered as a?difficult topic for the PMP? Exam. However, in my opinion, Procurement Management is one of the easier topics for the PMP? Exam.

So, Why do PMP? Aspirants find Procurement Management difficult?

I believe this is due to lack of experience in Procurement Management. Usually, PMP? Aspirants are well-experienced and knowledgeable about other aspects of Project Management. But, over the time, I have noticed that most of the PMP? Aspirants do not have relevant Procurement Management experience. They have not done procurement in their official capacity. I think practical experience is always useful for understating a PMP? Exam topic.

Let us make Procurement Management Easy for the PMP? Exam.

You may not have done any Procurement in your office. But as adults you would have definitely done Procurement at home. You would have certainly bought a vehicle or made arrangements for a family vacation. I believe understanding Procurement Management (in fact any Project Management topic) can become easy if you?correlate the PMBOK? Guide concepts with your daily life.

We will discuss?Types of Contract?in this article and leave other aspects of Procurement Management for another day. Let us understand Types of Contract by looking at one such small example. There are 3 basic Types of Contract:

Fixed Price (FP) Contracts

Cost Reimbursable (CR) Contracts – This is also called Cost Plus (CP) Contracts

Time and Material (T&M) Contracts

Let us understand these 3 basic Types of Contract. There are some sub-categories of basic Types of Contract also. We will not discuss the sub-categories in this article. Let us understand basic Types of Contract with the help of a small example.

Note: You can refer to?Max Wideman Glossary?to read some standard definitions on Types of Contract.

Example – House Renovation Project

Let us assume that we have to do a house renovation project. As part of renovation we need to rewire the whole house. There would be 2 broad?Cost Components?for the rewiring the house

Human Resource (HR) Cost e.g. Labor Cost

Material Cost e.g. Wire Cost

Let us also assume that?we (Buyer)?have called an?Electrical Contractor (Seller)?to lay the electricity wire. We asked the Contractor to provide us with a?Quotation?for re-wiring the house.

So, how would the Contractor prepare a Quotation?

The Contractor would start with an?estimate?of costs. The Contractor would consider aforementioned costs components (HR Costs & Material Cost) to arrive at an Estimate. There could be three different scenarios for arriving at an Estimate. The Contractor can potentially choose one of the possible three scenarios to arrive at an Estimate. The three scenarios would depend on

how much information we (as a buyer) have shared with the Electrical Contractor

what are the market (economic) conditions.

Let us take a look at these 3 scenarios in detail.

Scenario I – Fixed Price Quotation

Let us assume we called a Building Architect before calling the Electrical Contractor. The Architect provided us with complete Electrical Layout & Design.?The Architect also gave us Material Specifications of the Wiring to be used. In brief we?finalized everything before the Contractor walked in. We prepared a detailed?Statement of Work?for the Contractor. The contractor would study the detailed Statement of Work (finalized designs and material specifications) to provide a?Fixed Cost Estimate.

HR Cost – The contractor would look at the whole house and architectural design to estimate how many Labor units (duration & effort) would be required to complete the work.

Material Cost – The contractor would survey the house and study the Electrical Layout & Design to make an approximation of how much Wire (quantity of wire) would be required.

Based on above two estimates, the Contractor can estimate?Cost of Labor?and?Cost of Wire. The Contractor would total these Estimates and add some profit to provide us with a?Fixed Price Quotation. This Quotation (once finalized and accepted by us) would become part of the Contract. We will have to pay a?Fixed Price?to the Contractor for completing the work. Even if the Contractor overruns his estimates, we would not be liable to pay anything extra.

Salient Features of FP Contracts

In FP Contracts Scope is well defined and Price is Fixed.

FP Contracts could run into losses for the Seller if the costs are not managed well. FP Contracts are?more risky for Sellers.

Scenario II – Time & Material Quotation

This scenario would come if Electrical layout & design was not available with us. We will?not be able to provide a detailed?Statement of Work?to the Contractor. The Contractor would have to prepare the Quotation without a detailed Statement of Work.

HR Cost – Since the Electrical Layout & Design are not available, the Contractor would not be able to estimate how much Labor units (duration & effort) would be required to complete the work. The Contractor can, however, estimate the?Labor Rate per Day?(or any other unit of time e.g. hour or week).

Material Cost – Again the Contractor would not be able to estimate the quantity of wire that would be required to complete the work. The Contractor can, however, estimate the?Rate per Meter?(or any other unit of quantity e.g. Kg) for different types of wires required.

The contractor would add a suitable margin to estimated Labor Rate & Wire Rate for re-wiring the house. The Contractor would provide top-up Rates to us as a?Rate Quotation. These Rates (once finalized and accepted by us) would become part the Contract. These Rates will remain Fixed for the duration of the Contract. We will have to pay the?Fixed Rateto the Contractor for completing the work. The actual quantity of Labor and Material consumed will be used for making final payments.

Salient Features of T&M Contracts

In T&M Contracts Quantity is not defined and Rate is Fixed.

In T&M Contracts both Buyer and Seller can overrun their estimated Cost targets. T&M Contracts are?risky for both Buyers and Sellers.

Scenario III – Cost Reimbursable or Cost Plus Quotation

This scenario is similar to Scenario II above. This scenario would come if Electrical layout & design was not available with us. We will?not be able to provide a detailed?Statement of Work?to the Contractor. The Contractor would have to prepare the Quotation without a detailed Statement of Work.

In addition, let us assume that Market (Economic) Conditions are constantly changing. There is a constant?fluctuation of Labor Rates and Wire Rates?in the market. In these conditions, the Contractor cannot reasonably estimate a Fixed Rates.

In this Scenario, the Contractor would propose (since Labor Rate & wire Rate cannot be fairly estimated) that the?Actual Costs incurred?by her/him should be?Reimbursed. In addition, the Contractor, would ask for a?Suitable Fee?for the services that she/he would render to complete the work. This proposal (once finalized and accepted by us) would become part the Contract. Neither the Rates nor the Quantity would be Fixed for the duration of the Contract. A Service Level Agreement, however, can be defined as part of the Contract. We will have to?Reimburse all legitimate Costs?and give a?Suitable (Agreed upon) Fee?to the Contractor.

Salient Features of CP Contracts

In CP Contracts neither the Rate nor the Quantity is defined.

CP Contracts could be a huge overhead for the Buyer if costs are not managed well. CP Contracts are?more risky for?Buyers.

Conclusion

Who has more?Risk in different Types of Contract?

Fixed Price – Seller has more Risk

Time and Material – Buyer and Seller share Risk

Cost Plus – Buyer has more Risk

You should read my other article on that provides a?formal explanation?of different Types of Contract. It will help you in the PMP? Exam preparation.

Please leave a comment if you have any specific question.

Related Articles

difference between a Project Charter and Contract

Image courtesy of?Jeroen van Oostrom at FreeDigitalPhotos.net

#CONTRACT TYPE#DEFINITIONS#PROCUREMENT MANAGEMENT


Praveen Malik, PMP

?Praveen Malik ?is a certified Project Management Professional (PMP?) with a rich 23+ years of experience. He is a leading Project Management Instructor, Coach and ?Advisor. He ?has successfully trained thousands of aspirants for the PM certification exams.

最后編輯于
?著作權歸作者所有,轉(zhuǎn)載或內(nèi)容合作請聯(lián)系作者
  • 序言:七十年代末揭璃,一起剝皮案震驚了整個濱河市硫兰,隨后出現(xiàn)的幾起案子灼舍,更是在濱河造成了極大的恐慌雅宾,老刑警劉巖恰响,帶你破解...
    沈念sama閱讀 222,464評論 6 517
  • 序言:濱河連續(xù)發(fā)生了三起死亡事件拓颓,死亡現(xiàn)場離奇詭異讲坎,居然都是意外死亡,警方通過查閱死者的電腦和手機政己,發(fā)現(xiàn)死者居然都...
    沈念sama閱讀 95,033評論 3 399
  • 文/潘曉璐 我一進店門酌壕,熙熙樓的掌柜王于貴愁眉苦臉地迎上來,“玉大人匹颤,你說我怎么就攤上這事仅孩。” “怎么了印蓖?”我有些...
    開封第一講書人閱讀 169,078評論 0 362
  • 文/不壞的土叔 我叫張陵辽慕,是天一觀的道長。 經(jīng)常有香客問我赦肃,道長溅蛉,這世上最難降的妖魔是什么公浪? 我笑而不...
    開封第一講書人閱讀 59,979評論 1 299
  • 正文 為了忘掉前任,我火速辦了婚禮船侧,結(jié)果婚禮上欠气,老公的妹妹穿的比我還像新娘。我一直安慰自己镜撩,他們只是感情好预柒,可當我...
    茶點故事閱讀 69,001評論 6 398
  • 文/花漫 我一把揭開白布。 她就那樣靜靜地躺著袁梗,像睡著了一般宜鸯。 火紅的嫁衣襯著肌膚如雪。 梳的紋絲不亂的頭發(fā)上遮怜,一...
    開封第一講書人閱讀 52,584評論 1 312
  • 那天淋袖,我揣著相機與錄音,去河邊找鬼锯梁。 笑死即碗,一個胖子當著我的面吹牛,可吹牛的內(nèi)容都是我干的陌凳。 我是一名探鬼主播剥懒,決...
    沈念sama閱讀 41,085評論 3 422
  • 文/蒼蘭香墨 我猛地睜開眼,長吁一口氣:“原來是場噩夢啊……” “哼冯遂!你這毒婦竟也來了蕊肥?” 一聲冷哼從身側(cè)響起谒获,我...
    開封第一講書人閱讀 40,023評論 0 277
  • 序言:老撾萬榮一對情侶失蹤蛤肌,失蹤者是張志新(化名)和其女友劉穎,沒想到半個月后批狱,有當?shù)厝嗽跇淞掷锇l(fā)現(xiàn)了一具尸體裸准,經(jīng)...
    沈念sama閱讀 46,555評論 1 319
  • 正文 獨居荒郊野嶺守林人離奇死亡,尸身上長有42處帶血的膿包…… 初始之章·張勛 以下內(nèi)容為張勛視角 年9月15日...
    茶點故事閱讀 38,626評論 3 342
  • 正文 我和宋清朗相戀三年赔硫,在試婚紗的時候發(fā)現(xiàn)自己被綠了炒俱。 大學時的朋友給我發(fā)了我未婚夫和他白月光在一起吃飯的照片。...
    茶點故事閱讀 40,769評論 1 353
  • 序言:一個原本活蹦亂跳的男人離奇死亡爪膊,死狀恐怖权悟,靈堂內(nèi)的尸體忽然破棺而出,到底是詐尸還是另有隱情推盛,我是刑警寧澤峦阁,帶...
    沈念sama閱讀 36,439評論 5 351
  • 正文 年R本政府宣布,位于F島的核電站耘成,受9級特大地震影響榔昔,放射性物質(zhì)發(fā)生泄漏驹闰。R本人自食惡果不足惜,卻給世界環(huán)境...
    茶點故事閱讀 42,115評論 3 335
  • 文/蒙蒙 一撒会、第九天 我趴在偏房一處隱蔽的房頂上張望嘹朗。 院中可真熱鬧,春花似錦诵肛、人聲如沸屹培。這莊子的主人今日做“春日...
    開封第一講書人閱讀 32,601評論 0 25
  • 文/蒼蘭香墨 我抬頭看了看天上的太陽惫谤。三九已至,卻和暖如春珠洗,著一層夾襖步出監(jiān)牢的瞬間溜歪,已是汗流浹背。 一陣腳步聲響...
    開封第一講書人閱讀 33,702評論 1 274
  • 我被黑心中介騙來泰國打工许蓖, 沒想到剛下飛機就差點兒被人妖公主榨干…… 1. 我叫王不留蝴猪,地道東北人。 一個月前我還...
    沈念sama閱讀 49,191評論 3 378
  • 正文 我出身青樓膊爪,卻偏偏與公主長得像自阱,于是被迫代替她去往敵國和親。 傳聞我的和親對象是個殘疾皇子米酬,可洞房花燭夜當晚...
    茶點故事閱讀 45,781評論 2 361

推薦閱讀更多精彩內(nèi)容