2022-04-13(210)Engineering law and the ICE Contracts

10. “THE ENGINEER’S REPRESENTATIVE OR ANY OTHER PERSON”. It is reasonably clear that under this sub-clause the engineer may delegate his powers to one person only—either the representative or some other person responsible to him. This interpretation is strongly suggested by the contrast between the wording quoted at the head of this note and “any number of persons” in sub-cl. (2)—see p. 45. The context does not require “person” to be interpreted under cl. 1 (2) as including “persons”, because to allow the engineer to divide delegated functions amongst a number of persons, or even to give the same function to two or more concurrently, would produce considerable possibilities for confusion in the control of the works. If “other person” were interpreted to include the plural, logically so should “Engineer” and “Engineer’s Representative”, which interpretation would make the contract unworkable.

It appears that the engineer may himself continue to perform functions which he has delegated, but he is bound by any decision of his delegate unless the contractor refers the decision back to him under sub-cl. (4) or the contractor or employer asks for his decision under cl. 66. The contractor should particularly act under one of those provisions to obtain the engineer’s ruling in a case of conflicting instructions. q

11. “ANY ACT OF ANY SUCH PERSON”. “act”—not omission. For an omission to disapprove work see p. 127, N. 2. May a failure to contradict a confirmation of an oral variation order under cl. 51 be classed as an “act” ?

12. DELEGATION BINDS EMPLOYER “FOR THE PURPOSES OF THE CONTRACT”. This clause is, of course, purely for the contractor’s protection under this contract and binds the employer in relation to the contractor only. The engineer cannot rely on the clause as a defence to liability to the employer?for breach of his duty to supervise, if he delegates too freely to a representative (p. 384,N. 26), and the engineer may also be liable outside the contract to third parties for an act of a delegate.

13. NOTICE TO CONTRACTOR OF APPOINTMENT OF SUPERVISORS AND DELEGATION OF FUNCTIONS. The contractor is entitled to receive:

(a) From the engineer, written notice of the name of the person appointed engineer’s representative (cl. 1 (1) (d)).

(b) From the engineer or the engineer’s representative, notice (not specifically required to be in writing or to be prior notice as in (c) below) of the names and functions of the representative’s assistants. This requirement appears to apply to all assistants, even inspectors who are not intended to give any instructions under sub-cl. (2).

(c) Prior written notice of any delegation of the engineer’s functions under sub-cl. (3), specifying either the particular clauses of the contract in respect of which powers are being delegated or that the delegation is generally in respect of all the engineer’s powers under the contract except those not delegable.

(d) Written notification of any change of engineer (cl. 1 (1) (c)) or of the engineer’s representative (cl. 1 (1) (d)) and of change or determination of delegation under sub-cl.(3). Notice of determination of the powers of any assistant of the engineer’s representative is not referred to (nor indeed is any right of determination specified). However, under the general law the contractor will be entitled to rely on the instructions of any such assistant until (but only until) he receives notice of determination of his powers in such a form and from such a source that a prudent contractor would rely on it.

The contractor should be written to with clear-cut notification of the appointment and functions of supervisors as soon as possible after acceptance of tender. Until he receives this notice the contractor should act only on orders from or confirmed by the engineer.

Despite the extreme particularity of this cl. 2, which aims to contribute to the practical administration of the contract by allowing the contractor to determine exactly where he stands in dealing with resident staff, difficulties have been reported in practice due to the engineer’s refusal to follow this clause and to letters of delegation which fail to define delegated powers “specifically in respect of particular Clauses of these Conditions” as required by cl. 2 (3).

These clauses do not differentiate between minor and major variations and instructions, and particularly the absolute restriction on the powers of assistants to the representative (N. 7) may cause delays in practice while minor changes are confirmed.

There may be much to be said for a minuted meeting between the parties at the start of the works to devise a sensible and workable system of delegation of functions, under this clause and cl. 15 (2), and of co-operation between supervisors.

14. ENGINEER’S DECISIONS EXCLUDED FROM DELEGATION. The exclusion of cl. 12 (3) refers to action following notification of unforeseen physical conditions or obstructions, cl. 44 to extension of time, cl. 48 completion certificates, cl. 60 (3) the final certificate, cl. 61 the maintenance certificate, cl. 63 forfeiture, and cl. 66 a decision on referral back to the engineer of a dispute or difference.

Some important functions are not excluded from delegation, e.g. valuation of variations under cl. 52 and interim certificates. The engineer has no power under this clause of his own motion to alter a delegate’s valuation or reverse a decision that work is Engineering law and the I.C.E. contracts 44 an extra. The solution for the engineer is to advise the employer to refer the matter to him for a decision under cl. 66, but pending reversal of the delegate’s decision the employer must pay certificates based on it. For correction of a certificate under cl. 60 (7) refer to p.272.

15. “AUTHORISED BY THE ENGINEER UNDER SUB-CLAUSE (3)” appears to refer to “other person” and not to “act” so that there is a right of appeal to the engineer from acts of the engineer’s representative whether done under sub-cl. (1) in his ordinary supervision of the works, or under sub-cl. (3) in performing delegated powers.

16. APPEAL BY THE CONTRACTOR TO THE ENGINEER FROM A SUPERVISOR’S DECISION. This right of appeal provides a useful alternative to referral back to the engineer under cl. 66. The time for claiming arbitration does not run from the decision under this paragraph and the contractor is left with a right to a further engineer’s decision under cl. 66. The contractor particularly may apply for a review of a decision under this paragraph where he wishes to allow himself a further approach to the engineer when passions have cooled, but not of course if he wishes to go to arbitration as quickly as possible. For the scheme of appeals see N. 1.

17. APPEAL BY EMPLOYER FROM SUPERVISOR’S DECISIONS. The employer’s only way of appeal from a decision (of the engineer, his delegate, the engineer’s representative or his assistants) is to notify the contractor that a dispute exists and refer the dispute to the engineer under cl. 66, and then to arbitration provided he gives notice in time. The engineer should keep the employer advised of his right of appeal, and in particular should notify him of any doubtful decision made by a supervisor. For correction of a certificate refer to p. 272.

18. THE FORMER CLAUSE 2 (a) is moved to cl. 39 (3), and expanded (failure of supervisor to disapprove work or materials does not prejudice power subsequently to do so).

?著作權(quán)歸作者所有,轉(zhuǎn)載或內(nèi)容合作請(qǐng)聯(lián)系作者
  • 序言:七十年代末士骤,一起剝皮案震驚了整個(gè)濱河市,隨后出現(xiàn)的幾起案子躺苦,更是在濱河造成了極大的恐慌顶别,老刑警劉巖墓律,帶你破解...
    沈念sama閱讀 211,123評(píng)論 6 490
  • 序言:濱河連續(xù)發(fā)生了三起死亡事件,死亡現(xiàn)場(chǎng)離奇詭異,居然都是意外死亡梢薪,警方通過查閱死者的電腦和手機(jī),發(fā)現(xiàn)死者居然都...
    沈念sama閱讀 90,031評(píng)論 2 384
  • 文/潘曉璐 我一進(jìn)店門尝哆,熙熙樓的掌柜王于貴愁眉苦臉地迎上來秉撇,“玉大人,你說我怎么就攤上這事秋泄∷龉荩” “怎么了?”我有些...
    開封第一講書人閱讀 156,723評(píng)論 0 345
  • 文/不壞的土叔 我叫張陵恒序,是天一觀的道長(zhǎng)瘦麸。 經(jīng)常有香客問我,道長(zhǎng)歧胁,這世上最難降的妖魔是什么滋饲? 我笑而不...
    開封第一講書人閱讀 56,357評(píng)論 1 283
  • 正文 為了忘掉前任,我火速辦了婚禮喊巍,結(jié)果婚禮上屠缭,老公的妹妹穿的比我還像新娘。我一直安慰自己崭参,他們只是感情好呵曹,可當(dāng)我...
    茶點(diǎn)故事閱讀 65,412評(píng)論 5 384
  • 文/花漫 我一把揭開白布。 她就那樣靜靜地躺著何暮,像睡著了一般奄喂。 火紅的嫁衣襯著肌膚如雪。 梳的紋絲不亂的頭發(fā)上海洼,一...
    開封第一講書人閱讀 49,760評(píng)論 1 289
  • 那天跨新,我揣著相機(jī)與錄音,去河邊找鬼贰军。 笑死玻蝌,一個(gè)胖子當(dāng)著我的面吹牛蟹肘,可吹牛的內(nèi)容都是我干的。 我是一名探鬼主播俯树,決...
    沈念sama閱讀 38,904評(píng)論 3 405
  • 文/蒼蘭香墨 我猛地睜開眼帘腹,長(zhǎng)吁一口氣:“原來是場(chǎng)噩夢(mèng)啊……” “哼!你這毒婦竟也來了许饿?” 一聲冷哼從身側(cè)響起阳欲,我...
    開封第一講書人閱讀 37,672評(píng)論 0 266
  • 序言:老撾萬榮一對(duì)情侶失蹤,失蹤者是張志新(化名)和其女友劉穎陋率,沒想到半個(gè)月后球化,有當(dāng)?shù)厝嗽跇淞掷锇l(fā)現(xiàn)了一具尸體,經(jīng)...
    沈念sama閱讀 44,118評(píng)論 1 303
  • 正文 獨(dú)居荒郊野嶺守林人離奇死亡瓦糟,尸身上長(zhǎng)有42處帶血的膿包…… 初始之章·張勛 以下內(nèi)容為張勛視角 年9月15日...
    茶點(diǎn)故事閱讀 36,456評(píng)論 2 325
  • 正文 我和宋清朗相戀三年筒愚,在試婚紗的時(shí)候發(fā)現(xiàn)自己被綠了。 大學(xué)時(shí)的朋友給我發(fā)了我未婚夫和他白月光在一起吃飯的照片菩浙。...
    茶點(diǎn)故事閱讀 38,599評(píng)論 1 340
  • 序言:一個(gè)原本活蹦亂跳的男人離奇死亡巢掺,死狀恐怖,靈堂內(nèi)的尸體忽然破棺而出劲蜻,到底是詐尸還是另有隱情陆淀,我是刑警寧澤,帶...
    沈念sama閱讀 34,264評(píng)論 4 328
  • 正文 年R本政府宣布先嬉,位于F島的核電站轧苫,受9級(jí)特大地震影響,放射性物質(zhì)發(fā)生泄漏疫蔓。R本人自食惡果不足惜含懊,卻給世界環(huán)境...
    茶點(diǎn)故事閱讀 39,857評(píng)論 3 312
  • 文/蒙蒙 一、第九天 我趴在偏房一處隱蔽的房頂上張望鳄袍。 院中可真熱鬧绢要,春花似錦、人聲如沸拗小。這莊子的主人今日做“春日...
    開封第一講書人閱讀 30,731評(píng)論 0 21
  • 文/蒼蘭香墨 我抬頭看了看天上的太陽(yáng)哀九。三九已至,卻和暖如春搅幅,著一層夾襖步出監(jiān)牢的瞬間阅束,已是汗流浹背。 一陣腳步聲響...
    開封第一講書人閱讀 31,956評(píng)論 1 264
  • 我被黑心中介騙來泰國(guó)打工茄唐, 沒想到剛下飛機(jī)就差點(diǎn)兒被人妖公主榨干…… 1. 我叫王不留息裸,地道東北人蝇更。 一個(gè)月前我還...
    沈念sama閱讀 46,286評(píng)論 2 360
  • 正文 我出身青樓,卻偏偏與公主長(zhǎng)得像呼盆,于是被迫代替她去往敵國(guó)和親年扩。 傳聞我的和親對(duì)象是個(gè)殘疾皇子,可洞房花燭夜當(dāng)晚...
    茶點(diǎn)故事閱讀 43,465評(píng)論 2 348

推薦閱讀更多精彩內(nèi)容