2022-04-19(216)Engineering law and the ICE Contracts

2. “IN CASE OF AMBIGUITIES OR DISCREPANCIES…THE ENGINEER SHALL…ISSUE…RIATE INSTRUCTIONS IN WRITING”. The scope of the instructions which the engineer is entitled to issue in resolving an ambiguity or discrepancy in the contract is not altogether clearly expressed in the previous edition of this clause. This amendment gives the engineer the broad power to issue “appropriate instructions”, which are to be regarded as instructions under cl. 13 with a consequential liability to compensate the contractor in some cases.

As a result of this amendment, on resolving an ambiguity or discrepancy the engineer may give instructions not merely as to the “manner (in which) the work is to be carried out” as in the previous edition, but also, e.g., about the time in which the work is to be carried out, or the contents of any documents to be submitted by the contractor.

Nevertheless, two limitations stand from the 4th edition. The engineer may act under this clause only if there is genuinely an ambiguity or discrepancy in the contract; if the contract documents are clear they must usually be applied even if they produce a result which the parties obviously did not intend (N. 1). And the contractor still has no remedy under this clause for ambiguities the resolution of which cannot result in an “instruction”, for example an ambiguity about the method of payment for a claim.

3. EXTRA PAYMENT UNDER CLAUSE 13 FOR AMBIGUITIES AND DISCREPANCIES. The right to extra payment under cl. 13 as incorporated into this clause is less extensive than the contractor’s right to payment under cl. 6 of the previous edition.

Under cl. 13 the contractor is entitled only to compensation to the extent that the “instructions…involve the Contractor in delay or disrupt his arrangements or methods of construction”. The contractor is no longer entitled to extra merely because he has to do more work than he anticipated because of the ambiguity, e.g. where work is shown on one drawing and omitted from another or from the specification, except to the extent that the resolution of the ambiguity causes disruption or delay.

The only exception, specifically stated in this clause, is where the instruction requires a variation to the works. Therefore where the engineer gives an instruction involving work about which the contract documents are ambiguous, it will be necessary under this new wording for the engineer (or arbitrator or court ultimately) to decide as a matter of law the correct interpretation of the documents. If the legally correct interpretation is that the work included in the instruction is part of the original contract works, then the contractor has no remedy under this clause merely because he has been involved in cost “which by reason of any such ambiguity or discrepancy the Contractor did not and had?reason not to anticipate” (as he had under the former cl. 6), but only under cl. 13 if there is any delay or disruption involved. If the correct interpretation of the contract is such that the instruction requires the contractor to carry out extra work not part of the original contract works, then the instruction will amount to a variation order with a right to valuation under cl. 52. Since “The several documents forming the Contract are to be taken as mutually explanatory”, work shown e.g., on one drawing but not on another will usually be part of the original contract work and not a variation.

Thus the wording does not achieve what might be thought to be one purpose of a clause of this kind—that irrespective of the correct legal resolution of an ambiguity the contractor should be entitled to extra payment if he was misled by it as to the work to be done.

The engineer has a duty to resolve an ambiguity or discrepancy of his own motion whenever one comes to his attention, irrespective of any request by the contractor for an instruction.

If the contractor does not raise with the engineer an ambiguity or discrepancy of which he but not the engineer has become aware, so that delay or disruption is caused or aggravated, it is suggested that when the matter eventually has to be resolved by an instruction it may not be “reasonable” as required by cl. 13 for the engineer to award the contractor any of the extra cost resulting from the contractor’s default.

The contractor may even have a general duty to notify ambiguities in the contract documents of which he becomes or possibly should become aware, with liability to the employer or third parties for failure to do so. For breach of that duty the contractor may have to bear the costs of remedial works necessary because the ambiguity was not dealt with in time (p. 396).

The incorporation of cl. 13 brings with it cl. 52 (4) about notice of a claim by the contractor for extra payment for an instruction under this clause, and inclusion of payment in interim and final certificates (subject to retention).

?著作權(quán)歸作者所有,轉(zhuǎn)載或內(nèi)容合作請(qǐng)聯(lián)系作者
  • 序言:七十年代末,一起剝皮案震驚了整個(gè)濱河市流昏,隨后出現(xiàn)的幾起案子,更是在濱河造成了極大的恐慌,老刑警劉巖翼悴,帶你破解...
    沈念sama閱讀 212,383評(píng)論 6 493
  • 序言:濱河連續(xù)發(fā)生了三起死亡事件声功,死亡現(xiàn)場(chǎng)離奇詭異,居然都是意外死亡蹦误,警方通過(guò)查閱死者的電腦和手機(jī)芝薇,發(fā)現(xiàn)死者居然都...
    沈念sama閱讀 90,522評(píng)論 3 385
  • 文/潘曉璐 我一進(jìn)店門(mén)胚嘲,熙熙樓的掌柜王于貴愁眉苦臉地迎上來(lái),“玉大人洛二,你說(shuō)我怎么就攤上這事馋劈。” “怎么了晾嘶?”我有些...
    開(kāi)封第一講書(shū)人閱讀 157,852評(píng)論 0 348
  • 文/不壞的土叔 我叫張陵妓雾,是天一觀的道長(zhǎng)。 經(jīng)常有香客問(wèn)我垒迂,道長(zhǎng)械姻,這世上最難降的妖魔是什么? 我笑而不...
    開(kāi)封第一講書(shū)人閱讀 56,621評(píng)論 1 284
  • 正文 為了忘掉前任机断,我火速辦了婚禮楷拳,結(jié)果婚禮上绣夺,老公的妹妹穿的比我還像新娘。我一直安慰自己欢揖,他們只是感情好陶耍,可當(dāng)我...
    茶點(diǎn)故事閱讀 65,741評(píng)論 6 386
  • 文/花漫 我一把揭開(kāi)白布。 她就那樣靜靜地躺著她混,像睡著了一般烈钞。 火紅的嫁衣襯著肌膚如雪。 梳的紋絲不亂的頭發(fā)上坤按,一...
    開(kāi)封第一講書(shū)人閱讀 49,929評(píng)論 1 290
  • 那天毯欣,我揣著相機(jī)與錄音,去河邊找鬼晋涣。 笑死,一個(gè)胖子當(dāng)著我的面吹牛沉桌,可吹牛的內(nèi)容都是我干的谢鹊。 我是一名探鬼主播,決...
    沈念sama閱讀 39,076評(píng)論 3 410
  • 文/蒼蘭香墨 我猛地睜開(kāi)眼留凭,長(zhǎng)吁一口氣:“原來(lái)是場(chǎng)噩夢(mèng)啊……” “哼佃扼!你這毒婦竟也來(lái)了?” 一聲冷哼從身側(cè)響起蔼夜,我...
    開(kāi)封第一講書(shū)人閱讀 37,803評(píng)論 0 268
  • 序言:老撾萬(wàn)榮一對(duì)情侶失蹤兼耀,失蹤者是張志新(化名)和其女友劉穎,沒(méi)想到半個(gè)月后求冷,有當(dāng)?shù)厝嗽跇?shù)林里發(fā)現(xiàn)了一具尸體瘤运,經(jīng)...
    沈念sama閱讀 44,265評(píng)論 1 303
  • 正文 獨(dú)居荒郊野嶺守林人離奇死亡,尸身上長(zhǎng)有42處帶血的膿包…… 初始之章·張勛 以下內(nèi)容為張勛視角 年9月15日...
    茶點(diǎn)故事閱讀 36,582評(píng)論 2 327
  • 正文 我和宋清朗相戀三年匠题,在試婚紗的時(shí)候發(fā)現(xiàn)自己被綠了拯坟。 大學(xué)時(shí)的朋友給我發(fā)了我未婚夫和他白月光在一起吃飯的照片。...
    茶點(diǎn)故事閱讀 38,716評(píng)論 1 341
  • 序言:一個(gè)原本活蹦亂跳的男人離奇死亡韭山,死狀恐怖郁季,靈堂內(nèi)的尸體忽然破棺而出,到底是詐尸還是另有隱情钱磅,我是刑警寧澤梦裂,帶...
    沈念sama閱讀 34,395評(píng)論 4 333
  • 正文 年R本政府宣布,位于F島的核電站盖淡,受9級(jí)特大地震影響年柠,放射性物質(zhì)發(fā)生泄漏。R本人自食惡果不足惜褪迟,卻給世界環(huán)境...
    茶點(diǎn)故事閱讀 40,039評(píng)論 3 316
  • 文/蒙蒙 一彪杉、第九天 我趴在偏房一處隱蔽的房頂上張望毅往。 院中可真熱鬧,春花似錦派近、人聲如沸攀唯。這莊子的主人今日做“春日...
    開(kāi)封第一講書(shū)人閱讀 30,798評(píng)論 0 21
  • 文/蒼蘭香墨 我抬頭看了看天上的太陽(yáng)侯嘀。三九已至,卻和暖如春谱轨,著一層夾襖步出監(jiān)牢的瞬間戒幔,已是汗流浹背。 一陣腳步聲響...
    開(kāi)封第一講書(shū)人閱讀 32,027評(píng)論 1 266
  • 我被黑心中介騙來(lái)泰國(guó)打工土童, 沒(méi)想到剛下飛機(jī)就差點(diǎn)兒被人妖公主榨干…… 1. 我叫王不留诗茎,地道東北人。 一個(gè)月前我還...
    沈念sama閱讀 46,488評(píng)論 2 361
  • 正文 我出身青樓献汗,卻偏偏與公主長(zhǎng)得像敢订,于是被迫代替她去往敵國(guó)和親。 傳聞我的和親對(duì)象是個(gè)殘疾皇子罢吃,可洞房花燭夜當(dāng)晚...
    茶點(diǎn)故事閱讀 43,612評(píng)論 2 350

推薦閱讀更多精彩內(nèi)容